Cpec Progress

CPEC Energy Projects

  1. 2×660MW Coal-fired Power Plants at Port Qasim Karachi
  2. Suki Kinari Hydropower Station, Naran,Khyber Pukhtunkhwa
  3. ngro Thar Block II 2×330MW Coal fired Power Plant
  4. TEL 1×330MW Mine Mouth Lignite Fired Power Project at Thar Block-II, Sindh, Pakistan
  5. ThalNova 1×330MW Mine Mouth Lignite Fired Power Project at Thar Block-II, Sindh, Pakistan
  6. Surface mine in block II of Thar Coal field, 3.8 million tons/year
  7. Hydro China Dawood Wind Farm(Gharo, Thatta)
  8. 300MW Imported Coal Based Power Project at Gwadar, Pakistan

CPEC Infrastructure Projects

  1. KKH Phase II (Thakot -Havelian Section)
  2. Peshawar-Karachi Motorway (Multan-Sukkur Section)
  3. Khuzdar-Basima Road N-30 (110 km)
  4. Upgradation of D.I.Khan (Yarik) – Zhob, N-50 Phase-I (210 km)
  5. KKH Thakot-Raikot N35 remaining portion (136 Km)
  6. Expansion and reconstruction of existing Line ML-1
  7. Havelian Dry port (450 M. Twenty-Foot Equivalent Units)
  8. Capacity Development of Pakistan Railways

CPEC Gwadar Projects

  1. Gwadar East-Bay Expressway
  2. New Gwadar International Airport
  3. Construction of Breakwaters
  4. Dredging of berthing areas & channels
  5. Development of Free Zone
  6. Necessary facilities of fresh water treatment, water supply and distribution
  7. Pak China Friendship Hospital
  8. Pak-China Technical and Vocational Institute at Gwadar