CPEC Energy Projects
- 2×660MW Coal-fired Power Plants at Port Qasim Karachi
- Suki Kinari Hydropower Station, Naran,Khyber Pukhtunkhwa
- ngro Thar Block II 2×330MW Coal fired Power Plant
- TEL 1×330MW Mine Mouth Lignite Fired Power Project at Thar Block-II, Sindh, Pakistan
- ThalNova 1×330MW Mine Mouth Lignite Fired Power Project at Thar Block-II, Sindh, Pakistan
- Surface mine in block II of Thar Coal field, 3.8 million tons/year
- Hydro China Dawood Wind Farm(Gharo, Thatta)
- 300MW Imported Coal Based Power Project at Gwadar, Pakistan


CPEC Infrastructure Projects
- KKH Phase II (Thakot -Havelian Section)
- Peshawar-Karachi Motorway (Multan-Sukkur Section)
- Khuzdar-Basima Road N-30 (110 km)
- Upgradation of D.I.Khan (Yarik) – Zhob, N-50 Phase-I (210 km)
- KKH Thakot-Raikot N35 remaining portion (136 Km)
- Expansion and reconstruction of existing Line ML-1
- Havelian Dry port (450 M. Twenty-Foot Equivalent Units)
- Capacity Development of Pakistan Railways
CPEC Gwadar Projects
- Gwadar East-Bay Expressway
- New Gwadar International Airport
- Construction of Breakwaters
- Dredging of berthing areas & channels
- Development of Free Zone
- Necessary facilities of fresh water treatment, water supply and distribution
- Pak China Friendship Hospital
- Pak-China Technical and Vocational Institute at Gwadar